Wastewater


Wastewater is generated from both construction and operational activities and MTR has introduced practical measures to reduce and improve discharge quantity and quality. During 2002, a further 3 treatment plants and 11 external pipeline diversions were installed. These and other initiatives enabled MTR to be 98.8% compliant with the Water Pollution Control Ordinance during 2001:


¡P 96% for the Tsuen Wan Line
¡P 99% for the Island Line
¡P 100% for the Kwun Tong Line
¡P 100% for the Lantau Airport Railway


<Waste from Railway Construction>, <Waste from Operation Railway>,
< Passenger Waste Paper>
, <Noise>, <Emissions to Air>
Executive Summary Chairman's Message Introduction About MTR Sustainability Social Environment Economic Sustainability Awareness Environmental Performance in 2001 Social and Environmental Targets for 2002 GRI Indicator MTR's ENvironmental Policy Opinion Verification Feedback